Project BMT window factory
Change of the window production plant OKOMA UF DS
by Siemens S5 130W on Siemens S7 300
Setting of tasks:
By increased loss of the outdated control it
came repeatedly to loss of production. Change of the
control on the newest state of the art in as short a time as possible.
-
Planning and weakpoint analysis
-
Admission the necessary change measures
-
Cost analysis of the weak points
-
Project engineering and planning of the change
-
Control test of the program and hardware in the apron
-
Change and start-up of the control locally at the customer
in 3 days
-
Production company in the start-up phase
Tasks for the change:
-
Change in as short a period as possible, (loss of
production times reduce)
-
Begin a control with a high spreading degree, (purchase of
spare parts)
-
Highly reliable control, matured technology, (life span of
the control)
-
Program extension for future ones new profiles and tools,
(expandable)
-
Integration for Teleservice, plant support over modem
(faster response times)
-
Control expiration leave as alike as possible, (shorter
training of the operator)
-
Programming for later visualization train
-
Programming for interior and external profiles
Asset decription:
-
Concatenated window production plant with centers a
control S5 130W
-
1. Slot unit with buzz saw, 6-fach stroke slot spindle,
countering wood 6-fach, delivery unit and carriage
-
2. Forming unit with 3 profile spindle, 1 groove aggregate
from down, delivery unit
-
3. Electronically steered length notice
-
4. Slot unit with buzz saw, 6-fach stroke slot spindle,
countering wood 6-fach, delivery unit and carriage
-
5. Cross transport unit with transfer station
-
6. Forming unit with 1 profile spindle and 1 glass border
saw
|
|
|
|
|
|
|
|
|
|
Schlitz- und Profiliereinheit |
|
|
|
|
|
|
|
|
|
|
|
|
2. Profiliereinheit für Innen- und Ausenprofil |
|
|
|
|
|
|
|
|
|
|
|
|
Elektronischer Längenanschlag und 2 Schlitzeinheit |
|
|
|
|
|
|
|
|
|
|
|
|
2 Profiliereinheit mit Glasstabaustrennung |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Neue S7 300 Steuerung in Betrieb |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Simoreg Leistungsteil für Längenanschalg |
|
|
|
|
|
|
|
|
|
|
|
|
Konzept für Teleservice, Schnelle Fehlerermittlung |
|
|
|
|
|
|
|
|
|
valid to December 2003