Project BMT window factory

Change of the window production plant OKOMA UF DS

by Siemens S5 130W on Siemens S7 300

 

Setting of tasks:

By increased loss of the outdated control it came repeatedly to loss of production. Change of the control on the newest state of the art in as short a time as possible.

  • Planning and weakpoint analysis

  • Admission the necessary change measures

  • Cost analysis of the weak points

  • Project engineering and planning of the change

  • Control test of the program and hardware in the apron

  • Change and start-up of the control locally at the customer in 3 days

  • Production company in the start-up phase

 

Tasks for the change:

  • Change in as short a period as possible, (loss of production times reduce)

  • Begin a control with a high spreading degree, (purchase of spare parts)

  • Highly reliable control, matured technology, (life span of the control)

  • Program extension for future ones new profiles and tools, (expandable)

  • Integration for Teleservice, plant support over modem (faster response times)

  • Control expiration leave as alike as possible, (shorter training of the operator)

  • Programming for later visualization train

  • Programming for interior and external profiles

 

Asset decription:

  • Concatenated window production plant with centers a control S5 130W

  • 1. Slot unit with buzz saw, 6-fach stroke slot spindle, countering wood 6-fach, delivery unit and carriage

  • 2. Forming unit with 3 profile spindle, 1 groove aggregate from down, delivery unit

  • 3. Electronically steered length notice

  • 4. Slot unit with buzz saw, 6-fach stroke slot spindle, countering wood 6-fach, delivery unit and carriage

  • 5. Cross transport unit with transfer station

  • 6. Forming unit with 1 profile spindle and 1 glass border saw

 

Bedienterminel

Bedieneinheit

1. Schlitzeinheit

Schlitz- und Profiliereinheit

2. Profiliereinheit für Innen- und Ausenprofil

Elektronischer Längenanschlag und 2 Schlitzeinheit

2 Profiliereinheit mit Glasstabaustrennung

Alte S5 130W Steuerung

Neue S7 300 Steuerung

Neue S7 300 Steuerung in Betrieb

Umbau

Gleichstromregelantriebe

Simoreg Leistungsteil für Längenanschalg

Konzept für Teleservice, Schnelle Fehlerermittlung

 

valid to December 2003